What is a “Final Inspection” and when does it take place?

images

This inspection is done after the electrical installation is complete. This means that all receptacles, switches, cover plates, lighting fixtures and permanently connected appliances are in place and the panel directory has been completed. All unused openings in panel boards or junction and outlet boxes shall be filled with suitable fillers.

Where an appliance that is to be permanently connected is not yet on site, the cable shall be terminated in a junction box complete with a blank cover and the ends of the conductors shall be insulated with wire connectors or tape. Where permanent light fixtures are not yet on site, install temporary light fixtures or a blank cover on lighting outlet boxes.

The final inspection shall be requested as soon as possible after completion of the electrical installation.

Rule 2-004.

Ontario Electrical Safety Code 25th Edition/2012.

All electrical work requires a Certificate of Inspection from the Electrical Safety
Authority.

At Ring Electric, all electrical work is followed by a certificate of inspection to ensure work is compliant with the Electrical Safety Authority of Ontario.  Call (613) 299-8239 for a FREE quote!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s